DRAFT, needs technical review. Not for publication. The title is our own wording, not the official Paris MoU text.

PSC deficiency code 14108: Oily water separator 15 ppm alarm and stopping arrangements

Category MARPOL Annex I (pollution prevention)
Related certificate International Oil Pollution Prevention (IOPP)
Main references MARPOL Annex I Reg. 14 and MEPC.107(49)
Typical action codes 17 (rectify before departure), 30 (detainable) if serious
Commonly detainable? Can be, depending on severity (no statistics claimed)

What PSC officers look for

  • 15 ppm alarm fails test or not connected to stop device
  • Bypass line not secured or seal broken
  • Crew cannot explain zero discharge policy
  • Filter elements overdue
  • Flow meter or monitor reading not logged

Typical root causes

  • Test skipped to avoid delay
  • Unauthorised bypass during heavy bilge load
  • Spare elements not stocked
  • Chief engineer assumption that manual watch is enough

Corrective action (example)

Restore alarm and automatic stop; renew filters; secure bypass with controlled seal; test discharge monitor and record.

Preventive action (example)

Monthly alarm test in PMS; seal control in SMS with penalty for breach.

Evidence to attach for close-out

  • Test record with ppm reading
  • Seal log
  • Filter change record
  • Crew briefing sheet

Related

  • Codes: 14104, 14101, 14102
  • SIRE 2.0: Chapter 6 (pollution prevention) (chapter reference only)

Generate a close-out report for this finding · Download the CAP template


Official code list: Paris MoU, List of Deficiency Codes (1 July 2026). Action codes: Paris MoU, Inspection outcome. Reviewed by: _pending_ · Review date: _pending_ This page is general guidance, not legal, flag or class advice. Always follow the PSC officer's instructions and your flag and class requirements.

Next steps

Generate a close-out report for this finding

Report an error on this page