DRAFT, needs technical review. Not for publication. The title is our own wording, not the official Paris MoU text.

PSC deficiency code 07199: Other fire safety arrangements not covered by specific codes

Category Fire safety (SOLAS II-2)
Related certificate Cargo Ship Safety Equipment / Construction
Main references SOLAS II-2 (general)
Typical action codes 17 (rectify before departure), 30 (detainable) if serious
Commonly detainable? Can be, depending on severity (no statistics claimed)

What PSC officers look for

  • Arrangements that do not match approved fire control plan
  • Non-standard storage in protected zones
  • Improvised fire protection on new equipment
  • Deviations noted during drill not corrected
  • Industry guidance not reflected in ship-specific procedures

Typical root causes

  • Incremental changes without plan update
  • Fleet-wide practices not adapted to ship layout
  • Weak change management after refit
  • Assumption that generic checklist covers all spaces

Corrective action (example)

Align arrangement with approved plans or obtain formal plan amendment; remove non-compliant storage; document corrective steps against the specific observation.

Preventive action (example)

Require plan review trigger in SMS for layout or equipment changes.

Evidence to attach for close-out

  • Updated fire control plan or flag approval
  • Photos
  • Deviation report closed in SMS
  • Drill follow-up record

Related

  • Codes: 07105, 07110, 07123
  • SIRE 2.0: Chapter 5 (fire safety) (chapter reference only)

Generate a close-out report for this finding · Download the CAP template


Official code list: Paris MoU, List of Deficiency Codes (1 July 2026). Action codes: Paris MoU, Inspection outcome. Reviewed by: _pending_ · Review date: _pending_ This page is general guidance, not legal, flag or class advice. Always follow the PSC officer's instructions and your flag and class requirements.

Next steps

Generate a close-out report for this finding

Report an error on this page